stormwater bmps for SIC Code 2395

Stormwater BMPs for SIC Code 2395, Stormwater Permitting Guide

SIC Code 2395


2026 Stormwater Permit Compliance for SIC Code 2395 and applicable BMPs




Common Type-Based, Structural BMPs

  • Point BMP
    • Constructed Wetland
    • Infiltration Basin
    • Bioretention
    • Sand Filter (surface)
    • Rain Barrel
    • Cistern
    • Wet Pond
    • Dry Pond
  • Linear BMP
    • Grassed Swale
    • Infiltration Trench
    • Vegetated Filter Strip
    • Sand Filter (non-surface)
  • Area BMP
    • Green Roof
    • Porous Pavement


Common Pollutant Sources:

  • Exposure of lumber, residues, and vehicles/equipment to precipitation
  • Parts cleaning
  • Waste disposal of oily rags, oil and gas filters, batteries, coolants, degreasers
  • Fluid replacement including hydraulic fluid, oil, transmission fluid, radiator fluids, and grease
  • Diesel fuel


Common Toxicants

  • Nutrients
    • nitrates
  • Pesticides
    • 2,4-D γ -BHC (lindane)
    • malathion
    • atrazine
    • chlordane
    • diazinon
  • Other organics
    • VOCs
    • 1,3-dichloro-benzene
    • anthracene
    • benzo(a) anthracene
    • benzo(b) fluoranthene
    • benzo(k) fluoranthene
    • benzo(a) pyrene
    • bis (2-ethylhexyl) phthalate
    • fluoranthene
    • fluorene
    • naphthalene
    • pentachlorophenol
    • phenanthrene
    • pyrene
  • Pathogens
    • enteroviruses
    • Shigella
    • Pseudomonas aeruginosa
    • protozoa
  • Heavy Metals
    • nickel
    • cadmium
    • chromium
    • lead
    • zinc
    • copper
  • Salts
    • chloride


Common Pollutants:

  • BOD, TSS, oil, and grease
  • Solvents, oil, heavy metals, acid/alkaline wastes
  • Oil, heavy metals, solvents, acids
  • Oil and grease, arsenic, lead, cadmium, chromium, COD, and benzene
  • Diesel, gasoline, oil

Factors that can affect water quality:

  • Geographic location
  • Hydrogeology
  • Topography
  • Type, duration, and intensity of precipitation events
  • Extent of impervious surfaces (e.g., concrete or asphalt)
  • Type of ground cover (e.g., vegetation, crushed stone, or dirt)
  • Size of the operation



This site focuses or refers to information and services regarding Numeric Action Level (NAL) Exceedance Qualified Industrial Storm water Practitioner (QISP) Quality Assurance/Quality Control (QA/QC) Third Party Environmental Group (TPEG) North American Industrial Classification System (NAICS) Technology Based Effluent Limitation (TBEL) Chain of Custody Total Suspended Solids (TSS) Regional Water Board Storm Water Discharge Associated with Industrial Activity Monitoring Implementation Plan Wattles No Exposure Certification (NEC) pH Drainage Area Industrial Materials Operator Effluent Limitation Numeric Effluent Limitation (NEL) Run-on Monitoring Requirements Southern California Sheet Flow Toxicity Erosion Northern California Permit Registration Documents (PRDs) Total Organic Carbon (TOC) Areas of Special Biological Significance (ASBS) Discharger Effective Date Facility Non stormwater State Water Resources Control Board (SWRCB) National Pollutant Discharge Elimination System (NPDES) Best Practicable Control Technology Currently Available (BPT) Division of Water Quality (DWQ) Stormwater Benchmarks Stormwater Permit Best Management Practices (BMP) Storm Water Multiple Application and Report Tracking System (SMARTS) Stormwater Drainage Sediment Control BMPs Trade Secret Stormwater Discharge Points Source Non Storm Water Discharges (NSWD) Good Housekeeping BMPs United States Environmental Protection Agency (U.S. EPA) Turbidity State water Board Stormwater Qualifying Storm Event (QSE) Waste Discharge Identification Number (WDID) Storm Water Pollution Prevention Plan (SWPPP) Storm wattle Waters of the United States Non Detect Legally Responsible Person (LRP) Sedimentation Best Conventional Pollutant Control Technology (BCT) Oil and Grease (O&G) Best Available Technology Economically Achievable (BAT) Water Quality Standards Sediment Non-Governmental Organization (NGO) Debris Erosion Control BMPs Biochemical Oxygen Demand (BOD) Flocculant Socks Third Party Environmental Lawsuit (TPEL) New Industrial General Permit Storm Wattles Exceedance Response Action (ERA) Water Quality Based Effluent Limitation (WQBEL) Total Dissolved Solids (TDS) Effluent Field Measurements Wattle New Discharge(r) Notice of Intent (NOI) Structural Controls Minimum Level Municipal Separate Storm Sewer System (MS4) Standard Industrial Classification (SIC) Stormwater Guarantee Runoff Control BMPs Notice of Termination (NOT) Natural Background Scheduled Facility Operating Hours Multi Sector General Permit (MSGP) Water Quality Objectives Detected Not Quantifiable Total Maximum Daily Load (TMDL) Clean Water Act (CWA) New Source Performance Standards Industrial Storm wattles Numeric Action Level (NAL) Plastic Materials Notice of Non Applicability (NONA) Effluent Limitations Guidelines (ELGs) Scrap Metal Permit Storm Water Systems (SWS) Industrial General Permit (IGP) New Source Performance Standards (NSPS) Straw Wattles Method Detection Limit Ontario and more.

In addition, stormwater engineer services non-stormwater observation report stormwater benchmarks plastic inlet filter stormwater hazardous materials business plan california stormwater safety inspection plan stormwater regulations california stormwater mechanical filtration stormwater treatment stormwater rain information stormwater news california swppp health and safety consultation stormwater oil sheen sock stormwater expert witness california stormwater observation report stormwater discharge stormwater sampling california stormwater expert consultation stormwater regulations penalties stormwater vessels stormwater compliance audit stormwater management services stormwater environmental stormwater annual report stormwater plan of action stormwater runoff sampling stormwater record keeping stormwater filtration media industrial wattle stormwater osha safety and health inspection stormwater sand filters stormwater hmbp california environmental management stormwater consultant stormwater osha united states non-stormwater observation oil solidifying booms oil solidifying pillows stormwater quarterly observation and more.

Do businesses with sic code 2395 need a stormwater permit to comply with NPDES? Learn More.

Stormwater Permits for SIC Codes:


Disclaimer: Informational and educational purposes. Self-help services (not legal advice). Site is not affiliated with any state agency. Note that site might not contain the most updated information. Your receipt of any information from this site does not create a relationship. Prior results do not guarantee or suggest a similar result in other matters. No promise is made with regard to services or content's reliability, availabilty, or ability to meet any needs. Information and services provided "AS IS."

All Rights Reserved